Skip to content

Commercial & Residential

Driveway Sealcoating in Southwest Virginia

A fresh coat keeps water, sun and oil out of asphalt driveways and parking lots. Plan on it every 2 to 3 years.

Get a ballpark from photos

  • 4.7

    Google rating

  • 173

    Google reviews

  • A

    BBB rating

  • 2012

    Year we started

Google Business Profile and BBB profile figures, checked October 1, 2026.

Why sealcoat your driveway?

New asphalt is black. Give it a few years of sun, rain and oil drips and it fades gray, dries out, and starts to crack. Water gets into those cracks, freezes, and opens them wider.

Sealcoating puts a protective layer back on top. Skip it, and you end up paying for repairs that a reseal would have put off.

Benefits of sealcoating

  • Longer life.It fills small cracks and keeps water from getting under the surface.

  • Protection.It shields your asphalt from sun, oil spills, chemical stains and de-icing salt.

  • Looks.Your driveway or lot looks clean and cared for again.

  • Lower upkeep cost.Sealing on schedule means fewer and smaller repair bills.

Is your asphalt ready for sealcoating?

Good candidates

  • Asphalt that's solid but faded gray.
  • Hairline cracks, nothing wider.
  • Last sealed 2 to 3 or more years ago.
  • A parking lot due for a refresh before restriping.

Fix these first

Our sealcoating process

  1. Step 1: Clean

    Dirt, debris and loose material come off the surface.

  2. Step 2: Repair

    Cracks and potholes get filled so the sealer goes down on a solid surface.

  3. Step 3: Apply

    Sealer goes on in an even coat.

  4. Step 4: Dry

    The surface stays closed until it cures. Plan on 24 to 48 hours before you drive on it.

How often to sealcoat

  1. 1

    Year 0.

    New asphalt, or a fresh sealcoat.

  2. 2

    Years 2 to 3.

    Reseal. New cracks get filled first.

  3. 3

    Repeat.

    Heavy traffic and hard weather push it toward the 2-year end.

Commercial & residential sealcoating

Parking lot sealcoating works the same way as a driveway, on a bigger scale. The lot gets cleaned, cracks and potholes get repaired, then the sealer goes on. Busy lots wear faster, so they sit at the 2-year end of the cycle.

Sealer covers the old lines, so plan the restriping for right after the sealcoat. One closure, and the lot comes back with fresh stalls.

Parking lot striping

What customers say

4.7

out of 5 on Google, from 173 reviews

I would Highly recommend Paving Plus. Look no further for a Great Company to work with. Thanks Guys!
Becky W.Customer

Sealcoating questions

How often should I sealcoat my asphalt?

Every 2 to 3 years, depending on traffic and weather.

When can I use my driveway after sealcoating?

Wait 24 to 48 hours before driving on it.

Does sealcoating fix cracks and potholes?

It fills small cracks. Larger cracks and potholes need separate repairs, and those get done before the sealer goes on.

When is sealcoating season?

Sealer needs dry weather and mild temperatures to cure. Get it done before temperatures stay below freezing for the year.

What does sealcoating cost?

It depends on the square footage and how much crack repair it needs first. The estimate is free.

Can you sealcoat a parking lot?

Yes. Commercial and residential. The lot gets restriped after, since the sealer covers the old lines.

Still have a question? Call (540) 731-3000

Where the crews sealcoat

Based in Shawsville and working across Southwest Virginia. Pick your town to see local jobs and conditions.

See every town and county

Get a free sealcoating estimate

Send a photo of your driveway or book the free estimate. You'll hear whether it's ready for sealer or needs repairs first.

(540) 731-3000

The estimate is free.